Dome Project

Jan - 15
2018

Dome Project

This dome has “augments” over each window and door to allow the plumb (vertical) installation of the window and door units, since the dome walls slope inward from just above the finish floor elevation. The floor slab was done in a textured, colored concrete to give the owner a slate textured look and avoid having to install floor tile or carpet.
Notice the floor
Curved wall at top and bottom.
Walls meeting dome ceiling

Leave a Reply

Your email address will not be published. Required fields are marked *