Category: Projects

Jan - 15
2018

Dome Project

This dome has “augments” over each window and door to allow the plumb (vertical) installation of the window and door units, since the dome walls slope inward from just above the finish floor elevation. The floor slab was done in…

Jan - 15
2018

Storm Shelter Construction

The photos below show the various steps involved in building a Monolithic Dome, from bare land to the final paint. This dome has a diameter of 22′ at the raised floor level and 20′ at ground level and a height…